Saturday, June 12, 2010

Almost Done


In May, the floor was finished in a 2 stage epoxy. This is a base coat, a second layer of decorative flakes and then a 2 part clear coat is applied. From start to finish to dry, this took over a week - but the results are great.

Last weekend the lift was delivered and installed.

















This was not a do-it-yourself project...so I had the pros do the install
















Here it is completed. For those that need to know the technical features, it is a Bendpak 10 foot - 2 post 220 volt electric/hydrolic lift with a 9,000 pound capacity.
















I completed the electrical today and tested it out...It works!

















Full house! Next up tools and equipment