The blocks were delivered and there are a lot of them. The brick layers will be here for the next three days and the walls should be done. The contractor told me that it should be done in less than two, but the cold will slow production. (yah, it's only been 30 degrees each morning here)
Blocks delivered and Lintel beams installed (these are the beams across the garage door openings.)